Leave Your Message
list_banner2ufb

ABOUT RESEARCH AND DEVELOPMENT

ABOUT RESEARCH AND DEVELOPMENT
01
1. In TST, there is an advanced and professional R&D team to make the whole process standardized from the project, research and development, trial production to mass production. 

2. The a exchange meetings are always held between the R & D team and sales staff, which make the R & D team understand the problems and customer demands in the sales process and provides effective solutions in time.
ABOUT RESEARCH AND DEVELOPMENT2
02
3. If the problem cannot be solved in time, then we will list them and do special research and study one by one for seeking corresponding solutions, and developing corresponding personalized new products.

4. The R & D team often conducts technical learning and innovative research and uses the latest technology and research results for the development of new products, upgrades of mature products, reduced product energy consumption, and improves product performance.

About production Ablity

1Warehouse-of-Raw-Materialy3o
Warehouse of Raw Material
2Component-Inspectionw9c
Component Inspection
3SMT-Workshopxa4
SMT Workshop
4SMT-Inspectionrw4
SMT Inspection
5Wave-Soldering-Workshophnh
Wave Soldering Workshop
6Manual-Soldering-Workshop0xe
Manual Soldering Workshop
7PCBA-Ultrasonic-Cleaning-Machineogl
PCBA Ultrasonic Cleaning Machine
8Appearance-Inspectionqwd
Appearance Inspection
9Producing-Departmentu95
Producing Department
10Maintenance-Roomaqz
Maintenance Room
11Product-Aging-Roomdat
Product Aging Room
12Production-Test4l3
Production Test
13Product-Packaging-Workshopk9e
Product Packaging Workshop
14Finished-goods-warehousetic
Warehouse Finished Goods
01020304

About Quality

Raw-Materialuxu
Raw Material

Each batch of major raw materials is sourced from TST partners for more than 5 years to ensure product reliability. Each batch of raw materials will undergo a component inspection prior to production to ensure that the finished product is qualified.

RM-Inspectionwm8
RM Inspection

Before production, we will inspect the main material.TST has a strict raw material testing system, which will test all raw materials to ensure that each raw material is in line with the quality requirements.

Equipmentedv
Equipment

The production workshop will make arrangements after the inspection of raw materials is in place. During the production process, our employees are required to operate in strict accordance with the production process, and strictly abide by the requirements of quality standards. Each process is tested strictly quality, and the secondary products are not allowed to flow into the next production process.

Personnelxxp
Personnel

TST is committed to creating low-carbon, environment friendly and safe production. Before entering the workshop, all employees will wear masks and go through the disinfection process.

Finished-Productodo
Finished Product

After each batch of products are finished in the workshop, the quality inspectors will conduct random inspections on each batch of POE switch, poe splitter, poe module, poe cable , POE injector, etc. Only products that are fully compliant with the standards after quality testing can enter the product packaging process for packaging and warehousing and then to be sent to customers.

Final-Inspectionyb0
Final Inspection

QC department will inspect each batch of products before shipment. The inspection procedures include product packaging inspection, product appearance inspection, product function sampling testing or all testing. All these test results will be analyzed and approved by the engineer, and then sent to the customer.

01020304

About Delivery Time

65dff3883d

conventional products

For conventional products, TST has sufficient inventory. TST is equipped with a huge finished product warehouse, which contains sufficient finished products or semi -finished products, so that it can compress the delivery period to the shortest and timely delivery to customers.

65dff38fri

unconventional products

For unconventional products, TST stores sufficient electronic components. When receiving orders, we will immediately arrange production. Due to the sufficient inventory of the component, the production time will be guaranteed and can be delivered to customers within the normal delivery period.

65dff38dc9

other products

TST provides several million POE modules, poe switch and other poe network products every year. We adopt the latest high speed surface mount technology(SMT), which enable TST to provide the cost competitive products to customers and partners in a short lead time. 

About Sample Testing

1. For conventional products, TST provide samples for testing and ship the package within 48 hours.
2. For unconventional products, TST also provide samples for testing, but the delivery time takes 7-10 days.
3. For ODM development products, from starting to develop and design products, it usually takes 10-15 days to complete the sample. TST usually provides 2-3units samples for testing.
4. For ODM development customized products, if the customer is not satisfied with the performance after testing or requires changing functional parameters or dimension after receiving the sample, TST would provide secondary modification services.
about samplees8